Lien waiver management: a monthly routine for general contractors

How to manage lien waivers each month as a general contractor: the steps from request to accepted copy, a checklist and the follow-ups before the pay app.

ยท 4 min read

Open the free lien waiver management tool full screen

Lien waiver management is a monthly loop: ask every sub for a signed waiver for the period, review what comes back, chase the rest, and file what you accepted with the pay app. Do it on a fixed schedule tied to each project's billing day, and the pay app is never held up by a waiver you forgot to ask for.

This guide gives the loop, a checklist and the follow-up timing. It does not say which waiver form or type you need at each stage; that depends on your state, your contract and your lender, so confirm it with your attorney.

A monthly wall calendar with one date circled in orange marker above a desk with a folder of signed documents and a hard hat
Work backwards from the billing day on the circled date.

What is the monthly lien waiver process?

Six steps, run per project:

  1. Set the period and billing day. Write down the pay app date.
  2. List the subs owed a waiver. Include only those with work or a payment this period.
  3. Request. Send each sub the form, the period and what you need back, with a deadline before the billing day.
  4. Review. Check the signer, the date and the period on each copy.
  5. Chase. Follow up with those missing or rejected.
  6. File. Keep the accepted copies with the pay app.

Do not mark a sub done when a file arrives. Mark it done when you have opened it and found it correct.

When should I start requesting waivers?

Start about a week before the billing day for most projects, so the first reminder lands with time to spare. If you start on billing day, you are chasing under pressure. Adjust for projects where subs are slow or far-flung.

What should the request say?

Say what you want, for which project and month, and by when:

Hi Dana, for the Harbor Street Office pay app on the 25th we need your signed waiver for October, and an updated certificate of insurance if yours expires before December. Upload a PDF or photo here: [link]. Thanks.

Name the project and the period in the first line, because the common rejection is a waiver signed for the wrong month. Attach the form once, and reuse the same message each month.

How do I chase subs who don't answer?

Reminders do most of the work. A simple schedule is a second email two business days after the first, a call on day four, and a list for the project manager on day six. A forum commenter put the frustration plainly: the hard part is getting subs to sign it and send it back. The reminders matter more than the first request.

Keep the tone factual. Name the project, the date and what is still missing. Stop automated emails after the last reminder so a sub is not nagged forever, and move to a phone call.

What should I check on each waiver?

  • The signer's name and that they can sign for the sub.
  • The date.
  • The period, matching the one you asked for.
  • The project name.
  • That it is signed and readable.

Anything wrong goes back with a reason. A rejected waiver with a clear reason comes back right more often than a vague "please resend".

How can Waiver Chase run this loop?

Waiver Chase runs steps 3 to 6 for you. On request it emails each sub what is missing on each project with a no-login link. Reminders go out on weekday mornings on days 3, 7, 11 and 15 and then stop. Your morning digest lists the subs who never answered, certificate changes and uploads to review, and adds a warning three business days before each project's billing day and on the business day after it. Subs upload a signed PDF or photo up to 4 MB with the signer's name and date; you accept or reject with a reason. Each project has a tracker, there is an exceptions list across projects, and a ZIP packet of accepted waivers and certificates is ready for the draw, with missing ones listed on its cover sheet.

It does not supply forms, give legal advice, offer e-signature or read the waiver itself. You attach your own state's form and check each upload.

The free run on this page takes up to ten of your own subs and builds this month's lien waiver tracker, with the exact email each sub would get; nothing is sent to your subs. If you track by hand now, see the lien waiver tracking spreadsheet, and when you compare tools, read lien waiver software.

FAQ

How many days before the pay app should I request waivers?

About a week is a sensible start, with a reminder every couple of business days. Adjust to how quickly your subs respond.

What do I do when a sub never sends one?

Call them, tell the project manager, and decide with your contract and attorney how to handle the payment. A tracker shows who is missing; it does not decide the payment.

Should I use the same process on every project?

Use the same loop, but set each project's billing day and waiver type, since lenders and owners differ.

Every sub's lien waiver and COI in before you release the pay app

Waiver Chase emails each subcontractor what is missing for the month, reminds the ones who don't send it, tracks COI expiry dates, and lists what is still outstanding on every project.

$149/ month

Get started

Cancel any time.