This schematic shows how the factory changes an idea into a product on sale. Each box is a stage. The instrument in each box shows the work in that stage. Select a stage to see its tasks.
DMC VF-A-01-040A SOP 4.4.0 · REV 2 LANGUAGE ASD-STE100 DATE 2026-10-14
Select a stage to see its tasks.
Now
All stages
Each stage shows its result for one normal launch.
Review passed → on sale
0 min
030 min target60
The clock starts when the review passes.
Time from review to sale
Before 2026-10-14about 45 min
The ship did all the tests again. It deployed 22 Workers one at a time.
Nowabout 20 min
The ship uses the merge result. It deploys 6 Workers at a time.
These times are estimates from the stage times. The next ship gives a measured time.
Work unit: idea, branch or deployReturn path: fix round or evidenceBlocker: the branch waitsFailure: rollbackLamps: working, done, problem
CAUTIONDo not merge a new product before its launch check is satisfactory. If you merge it, main can contain a product that is not on sale.
Tasks per stage
Technical names
Conductor
The scheduled agent. It plans each run and starts the workflows.
Worktree
A separate copy of the code. One agent uses it for one task.
Main
The code that production uses.
Smoke
A short test of the live features on a copy of the system.
Blocker
A record of a missing item. It stops one task until the item exists.
Flag
A record that a change touches billing, sign-in, deletion or the gate.
Worker
A program on Cloudflare. Each business has one Worker.
IndexNow
A service that tells Bing about new and changed pages.